Ao Teng / AOTENGAOTENG
ProductsIndustrial procurement detail
LED Electrical Optical T30 LED Bulb-in-bulb E12 Head 6LED Beads Bulb-in-bulb AC/DC24V

LED Filament Bulbs

LED Electrical Optical T30 LED Bulb-in-bulb E12 Head 6LED Beads Bulb-in-bulb AC/DC24V

T30E1224VMOQ 1000 packs

MOQ

1000 packs

Price range

$0.69-1.55

Procurement Notes

Confirm replacement fit by base, voltage and wattage before bulk RFQ. Include quantity, target market and packaging needs for faster quotation.

Key Specifications

Model
T30
Lamp base
E12
Voltage
24V
Wattage
Custom / TBD
Color temperature
TBD
MOQ
1000 packs
Price range
$0.69-1.55
Category
LED Filament Bulbs

Customization & Supply

OEM/ODM support
Custom voltage and base options
Sample confirmation before bulk order
Bulk order and packaging support

Product Sourcing Questions

Before you quote this item

Use these questions to confirm whether this product fits your replacement, OEM or bulk purchasing plan.

What sourcing needs does LED Electrical Optical T30 LED Bulb-in-bulb E12 Head 6LED Beads Bulb-in-bulb AC/DC24V fit?

This product is listed under LED Filament Bulbs. It can be reviewed for replacement sourcing, bulk RFQ and OEM/ODM programs where the buyer needs to confirm specifications before ordering. Share the application, target quantity and packaging requirements during RFQ.

Which specifications should be confirmed before quotation?

Confirm model T30, base E12, voltage 24V before quotation. For replacement sourcing, also share an old sample photo, equipment reference or previous model number so AOTENG can review the match more accurately.

Can this product be added to an RFQ list?

Yes. Add this product to the RFQ list or send the product link with quantity, target market and packaging requirements. The current MOQ reference on this page is 1000 packs; final MOQ and lead time should be confirmed by quotation.

Are online price and stock fixed for this product?

No. AOTENG quotes B2B specialty bulb orders by specification. Price, stock status, lead time and packaging route depend on specification, quantity, sample confirmation and the production schedule, so they should be confirmed through RFQ.